How Long Does It Take to Fit a Kitchen?

Kitchen installation is a complex project that requires specialised help to execute with zero error. Being a complex project, this sort of installation takes between 5-10 working days. However, this is just a general idea. The exact idea of installation duration can only be assessed by factoring in the size and complexity of the room.

A typical kitchen installation usually includes removal of the existing kitchen, tiles, appliances and any secondary items. This is followed by installation of the new cabinets, worktops, sink & taps and any appliances as well as extra items.

So how long does it take to carry out this whole process of kitchen installation? We’re going to uncover all these details which will help you estimate your schedule and budget accordingly. So what’s the wait? Let’s start!

New Kitchen or Renovation – What Takes Longer?

Put simply, new kitchen installation takes lesser time than an overhaul. Both these processes involve kitchen installation and allow their customisation as well. However, the difference is that renovation includes removing the old design and upgrading the kitchen while installing a new kitchen means a like-for-like replacement.

Here’s how the two different installation processes differ in their installation times:

  • New Kitchen Installation Time

Installing a new kitchen can take two to three weeks. However, if you’re integrating extra features and utilising high-end materials, the installation can take extra one to two weeks.

  • Renovation Time

When you’re installing kitchen during renovation, it takes more time than installing a new kitchen. The reason is that there are several things to do during this process, including changing the layout, relocating wiring/gas line, adding new features, or facing unanticipated delays. This entire process stretches the process 4/5 weeks to a few months.

Why Some Kitchens Take Longer Than Planned?

We’ve told you only a few factors in the intro that affect kitchen’s installation time. Here’s the full discourse:

  1. a)  Kitchen Size Matters

It’s obvious – a smaller kitchen will take lesser installation time than a larger customised one. However, a kitchen size may be small but if you need to install additional features and use heavy materials, this can extend the installation time, even if the size is small.

  1. b)  Unanticipated Interruptions

During installation, if the installers find hidden leaks or faulty wiring, this may arise unexpected problems. Another factor is inspection. During relocating your kitchen, if you acquire a survey to ensure compliance with local guidelines and building codes, this can further delay your kitchen installation time.

  1. c)  Design Variations

During installation, if you’re keeping the original layout for your kitchen, then it will take lesser time compared to, changing the layout to any other design, like galley, U-shape, L-shape, open-plan, peninsula, etc.

  1. d)  Material Type Matters

Working with heavy materials like natural stones? Consider your kitchen fitting time extended due to the worktop preparation and installation. The reason is simple. Properly cutting marble, quartz, or granite in the right proportion requires time and precision, thus, more installation time.

  1. e)  Project Scope

Adding more cabinets, installing new features, rewiring, relocating pipework, etc., can extend your kitchen fitting time. The more appliances or features you add, the more time it’ll take.

f)  Kitchen’s Current Condition
The state of your existing kitchen plays a major role in how long renovations take. If you’re dealing with cracked walls, outdated cabinets, or damaged pipework, your fitters will need extra time for repairs before installing new fittings.

g)  Coordinating Skilled Tradespeople
Kitchen projects often involve multiple experts, from electricians to plumbers and carpenters. Aligning their schedules can be tricky, and even a small delay from one trade can affect the rest. Booking in advance helps keep things moving smoothly.

h)  Material & Appliance Delays
When key materials or appliances are held up in delivery, work can’t progress as planned. Supply chain issues are common, so ordering early or choosing readily available options is the safest bet.

i)  DIY vs. Professional Installation
A DIY kitchen might sound budget-friendly, but it usually takes longer. Professionals bring experience, tools, and efficiency, completing the job faster and with a polished finish.

j)  Permits & Inspections
For certain projects, especially those involving plumbing or wiring, official permits and inspections are mandatory. These processes can take extra time, so it’s best to plan for them early in your renovation timeline.

Smart Ways to Avoid Delays

Now you may understand the duration for kitchen installation. If you’re stressing over these long durations and want to save on time, we’ve some expert tips up our sleeve for your convenience. Let’s find out about these tips:

  • Plan Smart, Start Early
    A successful kitchen installation starts long before the first cabinet is fitted. Finalise your design early and order materials in advance to avoid frustrating delays due to long lead times.
  • Trust the Experts
    Your kitchen is an investment, and it deserves expert hands. Hiring skilled kitchen fitters ensures the job is done efficiently and any unexpected challenges are handled with ease and precision.
  • Keep the Conversation Flowing
    Open communication with your contractors keeps everyone on the same page. Regular updates help you stay informed about progress and allow quick resolution of any concerns that may arise.
  • Prep Your Space for Success
    Before the team arrives, make sure the kitchen area is ready. Clear out personal items and give your fitters easy access to the workspace — it saves time and helps maintain a smooth workflow.
  • Stay Calm, Stay Flexible
    Even the best-planned projects can face delays due to weather, supply issues, or unexpected structural hiccups. Stay patient and flexible — it’ll make the entire process far less stressful.
  • Choose Simplicity for Speed
    While bespoke designs are beautiful, they often take longer to produce. Choosing standard-sized cabinets and readily available materials can speed up installation without compromising on style or quality.

Summing It Up….

You can get an idea from the above-mentioned information how long can kitchen installation can take. On average, the duration is 1-3 weeks for the process. However, the exact duration varies with factors like the size and complexity of the design, the condition of the existing space, and the materials used.

Knowing these details will help you set a timeline and assess potential risks in advance so you can take steps to ensure a seamless and efficient process. So, if you’re planning to install your next open kitchen, island kitchen, or a gallery kitchen, choose the best installers for error-free execution and peace of mind.

Fancying a New Kitchen Installation?

Glam Kitchen is a reliable kitchen contractor, offering all-inclusive kitchen services, from delivery to installation and finishing. From classic traditional kitchen to contemporary ones, we’ve every kitchen design, size, and material for your residential and commercial properties. So, if you’re ready to uplift your property, get in touch with our local operators and book your kitchen today.

YOU MAY ALSO LIKE

Leave A Comment